Subscribe to RSS

Found 38 records | Page 1 of 4


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 233 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

Globe Telecom Lays Submarine Cable to...

by wirelinks on 10/31/2012 - 11:11 pm
Tag: Projects

Globe Telecom has established a fiber optic interconnection to Borcay Island through the Boracay Submarine Cable System, a two-kilometer fiber optic cable that transmits "80 wavelengths of Dense Wavelength Division Multiplexing or DWDM systems with a capacity of 40 gigabytes per second (GBPS) per wavelength and is expandable to 100 GBPS,” it said in a news release.

 

This can provide “near to limitless transmission capacity, which will result [in] crystal-clear voice call and superfast surfing,” said Globe chief technical adviser Robert Tan.

 

“[W]e have powered up our cell sites with 3G and HSPA+ connectivity,” he added.

 

Globe president a ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 232 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

Mark 4 ART Sets New Standards in Adva...

by wirelinks on 10/31/2012 - 05:29 pm
Tags: Press Release, Product Release

QED Wire Lines has completed the design and is in final field testing of our brand new immersion burner: the Mark 4 ART. This Advanced Recuperative Technology burner offers unparalleled heat recovery from an extended double-pass recuperator that pre-heats incoming combustion air. The finite element analysis design optimizes energy efficiency and delivers with cooler burner skin temperatures.

 

 

Building on the strengths of the Mark 3 burner, this unit also delivers air spin dynamics for excellent flame retention, smooth starting and reliable operation. This single ended radian tube type of burner is now available for upgrading existing immersion burner systems.


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 231 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

General Cable Q3 Profit Misses View, ...

by wirelinks on 10/30/2012 - 05:17 pm
Tag: Press Release

Power transmission cable maker General Cable Corp. (BGC) reported Monday a profit for the third quarter that soared from last year, reflecting strong performance of the ROW segment. Adjusted earnings per share missed analysts' expectations, while quarterly revenues topped their estimates by a whisker. The company also issued earnings and revenue forecast for the fourth quarter, well below Street view.

 

 

Additionally, the company announced an agreement to acquire privately-held Prestolite Wire, LLC.

 

 

The company noted that it has identified certain inventory related accounting errors within its ROW segment that were erroneously computing cost of sales over the ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 230 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

Xilin Iron & Steel Orders New Wire Ro...

by wirelinks on 10/30/2012 - 04:37 pm
Tag: Press Release

Xilin Iron & Steel from Heilongjiang Province (China) is increasing its production capacities with a new high-speed wire rod mill from SMS Meer. The 2-strand mill with 10-stand wire rod blocks achieves a rolling speed of 120 m/s. The plant can produce 1 million tonnes of wire rod per year."

 

 

Our high quality combined with the proximity to the Chinese market convinced Xilin Iron & Steel,” says Zuo-Guo Xiao, Managing Director of SMS Meer in China. The maximum rolling speed of 120 m/s – corresponding to 432 km/h – makes high demands on the equipment and the process management. “Xilin Iron & Steel can depend on all the processes running stably ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 229 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

China Iron and Steel Association Repo...

by wirelinks on 10/30/2012 - 04:29 pm
Tag: Product Release

According to the China Iron and Steel Association, end of October 2012, inventory of the main finished steel products (plate, hot rolled coil, cold rolled coil, rebar and wire rod) in 26 major steel markets in China totaled 12.43 million tonnes, down by 274,000 tonnes as compared to the previous week and indicating a week on week decline for three straight weeks after the National Day holiday.

 

Meanwhile, China's total finished steel inventory on the date in question was down 1.90 million tonnes YoY, reaching the lowest level since 2010.

 

As of October 26th 2012, three of the main finished steel products indicated declines in inventory on week on week basis. In particular, in ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 199 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

Aker Solutions Awarded Murphy Umbilicals

by wirelinks on 10/27/2012 - 05:41 am
Tags: Press Release, Projects

Aker Solutions has been selected to supply two production control umbilicals and three umbilical termination assemblies (UTAs) to Murphy Exploration & Production Company - USA. The products will be delivered to the Murphy operated Dalmatian field in the De Soto Canyon located in the Gulf of Mexico which is jointly owned by Murphy and Ecopetrol America Inc. Contract value is undisclosed.

 

 

The main control and injection umbilical will tie the host facility to Murphy's De Soto Canyon Block 4 well for a distance of 21 miles (34 km). The second umbilical is an infield umbilical that will connect two blocks 5 miles (8 km) apart. The umbilicals will be used in water depths of ap ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 228 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

PWM to Exhibit at Cable & Wire Fair, ...

by wirelinks on 10/26/2012 - 01:47 am
Tag: Press Release

PWM, leading manufacturer of cold welding equipment and dies, will be demonstrating its range of British-made, high-performance cold pressure welders, on Stand 1-E06 at the Cable & Wire Fair, CNR Expo, Istanbul.

 

 

The largest manual machine on show, the M101, is a strong, heavy-duty machine, which is simple to operate and easy to maintain, due to the small number of component parts. One of PWM’s best-selling models, the M101, for wire sizes 1.00mm to 3.60mm copper and 1.00mm to 5.00mm EC aluminium, can be bench-mounted or supplied with a trolley, enabling the operator wheel the machine quickly to the work area.

 

 

PWM’s unique cold welding equipme ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 227 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

NEXANS : and Fincantieri Enters into ...

by wirelinks on 10/26/2012 - 01:40 am
Tag: Press Release

Nexans, a worldwide expert in the cable industry, has won a 6 million Euro contract to manufacture and supply shipboard cables to Fincantieri, the Italian ship builder. The cables and accessories will come from Nexans' SHIPLINK brand of electrical cables for power, control and instrumentation applications where they offer light weight, easy and quick installation in confined spaces.   

 

 

The cables will be delivered to Fincantieri's shipyard in Monfalcone, Italy, where they will be used in the construction of two cruise ships for one of the large player of the market. The cables supplied are designed under latest IEC standards ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 226 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

Nextrom's Fiber Optics Day Proved to ...

by wirelinks on 10/25/2012 - 03:40 am
Tag: Press Release

The Fiber Optics Day event took place at the Nextrom plant in Finland on May 22nd and 23rd. This was the third time this event had been held. The event was a great success and was very well received by partners and customers from the optical fiber and fiber optic cable industry, bringing together over 100 guests from various different companies from around the world. This excellent turnout showed that interest in Nextrom is high in today’s market. The products and services that Nextrom has developed as a market leader in fiber optic technology attracted a high degree of interest from across the globe.

 

 

The two days covered a range of topics of interest concerning the la ...

Read More


ERROR: http://wirelinks.com/blog/results.php

Query: UPDATE Report_Post SET report_amount = report_amount + 1 WHERE post_id = 225 AND report_type = 1 AND DATE_FORMAT(date, '%Y-%m-%d') = DATE_FORMAT(NOW(), '%Y-%m-%d')

 Errno: 145
 Error: Table './tubel_domain3/Report_Post' is marked as crashed and should be repaired
_SERVER data
    REMOTE_ADDR : 54.158.221.251
    REMOTE_PORT : 45002
SCRIPT_FILENAME : /home/tubel/public_html/blog/results.php
 REQUEST_METHOD : GET
   QUERY_STRING : url_full=/blog/archives/year/2012/month/10
    REQUEST_URI : /blog/archives/year/2012/month/10

Madem GULF IND WIRE & CABLE INDIA 201...

by wirelinks on 10/25/2012 - 01:47 am
Tag: Wire India

PLEASE VISIT  Madem Gulf Industries booth 1E31 Hall 1

 

 

WIRE & CABLE INDIA 2012 www.wire-india.com -   BOMBAY EXHIBITION CENTRE : NESCO Complex, Western Express Highway, Goregaon (E) Mumbai 400 063, India

 

 

Date & Show Time: 30 – 31 October - 10.00 AM to 6.00 PM

01 November     - 10.00 AM to 5.00 PM

 

 

Complimentary Entry Ticket:

Our company is allotted free complimentary tickets, for our esteemed clients. Wewould like your kindself to use the following link for online registration and receive your personal Complimentary entry ticket. http://www.zesteventex.com/wci/